skip to Main Content
Loading Events

« All Events

  • This event has passed.

Adams Bridge Replacement Virtual Hearing

February 8 @ 6:30 pm - 7:30 pm

Virtual design public hearing on replacement of bridge No. A-04-038 in the Town of Adams; register here to participate via the internet: www.mass.gov/orgs/highway-division/events This is an opportunity for the public to learn about the proposed replacement of the Quality St. bridge over the Hoosic River. Roadways will remain open to traffic throughout the construction phase. Flyer link here.

DATE: Thursday, February 8

TIME: 6:30 PM – 7:30 PM

LOCATION: Online via Zoom

Venue

Online
Back To Top