Three County Fairgrounds Redevelopment – Northampton
EEA# 14509

Submitted November 23, 2009
Environmental Notification Form (pdf)
Comments due December 14, 2009

Site visit – 11/30/2009 – 10:00 AM – at the Project Site – Fair Street, Northampton

For copies: Jeff Squire (413) 582-7000
MEPA Analyst: Aisling Eglington (617) 626-1024

return to list of projects or return to top

Greater Springfield Reliability Project – Springfield, West Springfield, Agawam, Chicopee and Ludlow – 1/7/09
EEA# 14271

Submitted November 23, 2009
Final Environmental Impact Report – no pdf on line
Comments due December 23, 2009

For copies: Robert Carberry (860) 665-6774
MEPA Analyst:
Holly Johnson (617) 626-1023

Issued February 13, 2009
Secretary’s Certificate (pdf) – Adequately and properly complies with MEPA

Submitted January 7, 2009
Draft Environmental Impact Report – no link
Comments due February 6, 2009

Issued August 1, 2008
Secretary’s Certificate (pdf) Requires an Environmental Impact Report

Submitted June 25, 2008
Environmental Notification Form (pdf)
Comments due July 25, 2008

Originally one was to contact for copies: Jerry Fan (203) 284-8590
MEPA Analyst for the original was Briony Angus

return to list of projects or return to top

South End Urban Renewal Plan, Amendment No. 8 – Springfield
EEA# 14488

Issued October 23, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report

Submitted September 23, 2009
Environmental Notification Farm (pdf)
Comments due October 13, 2009

For copies: Samalid Hogan (413) 787-6020
MEPA Analyst: Purvi Patel (617) 626-1029

return to list of projects or return to top

Town Roadway Improvement Project – Westfield
EEA#
14473

Issued September 25, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report

Submitted August 26, 2009
Environmental Notification Form (pdf)
Comments due September 15, 2009

For copies: Jessie Wilson (617) 973-8281
MEPA Analyst: William Gage (617) 626-1025

return to list of projects or return to top

Reconstruction of Lower Van Horn Reservoir Dam – Springfield
EEA# 14470

Issued September 11, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report

Submitted August 12, 2009
Environmental Notification Farm (pdf)

Comments due September 1, 2009

For copies: Anja Ryan (413) 525-3822
MEPA Analyst: Nicholas Zavolas (617) 626-1030

return to list of projects or return to top

Proposed Single Family House – New Salem
EEA# 14433

Issued July 24, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report

Submitted June 24, 2009
Environmental Notification Farm (pdf)

Comments due July 14, 2009

For copies: Robert Stover (413) 256-3400
MEPA Analyst: Nicholas Zavolas (617) 626-1030

return to list of projects or return to top

Russell Biomass Power Plant – Russell
EEA# 13635

Submitted December 9, 2009
Supplemental Environmental Impact Report no link provided
Comments due January 8, 2010

Issued August 7, 2009
Secretary’s Certificate (pdf)
Requires an Environmental Impact Report

Submitted June 10, 2009
Notice of Project Change (pdf)
Comments due June 30, 2009

Note there were previous submissions in prior years. Below is the MEPA table of “Action Information” on this project:

Action Information
Submission Monitor Vol No. Monitor Date Comments Due Date Action Action Date Comments
ENF 64-10 09/24/2005 10/24/2005 EIR 10/31/2005
DEIR 68-05 07/11/2007 08/24/2007 ADEQAT 09/07/2007 NPC/DEIR
FEIR 69-08 02/20/2008 03/21/2008 ADEQAT 03/28/2008
PC 73-03 06/30/2009 06/30/2009 EIR 08/07/2009
SEIR 73-03 12/09/2009 01/08/2010

For copies: Rebecca Sherer or Tracy Adamski (413) 562-1600
MEPA Analyst: Aisling Eglington (617) 626-1024

return to list of projects or return to top

 

Granby Landfill – Granby

Submitted May 20, 2009
Notice of Issuance of a Draft Operating Permit (Renewal) (pdf)

return to list of projects or return to top

 

Western Mass. Electric Co – Belchertown, Granby and Ludlow –

Submitted May 20, 2009
Notice of Application for a 401 Water Quality Certification

Pursuant to M.G.L. c. 21 943, an application for 401 Water Quality Certification is
pending before the Department of Environmental Protection for the 354 Line
Structure Replacement Project. The applicant is Western Massachusetts Electric
Company, c/o Northeast Utilities, P.O. Box 270, Hartford, CT 06141-0270. ‘the
project involves the replacement of eight (8) electrical utility pole structures along
the #354 345 kV transmission line between Erving and Ludlow, Massachusetts.
Work which requires the filing of a 401 Water Quality Certification will occur in the
communities of Belchertown, Granby and Ludlow. Additional information may be
obtained from the applicant’s agent – Tighe & Bond, Inc. c/o Daniel Rukakoski, PWS
(413-875-1312). Written comments should be addressed within 21 days of this
notice to:
Massachusetts Department of Environmental Protection
Western Regional Office
Division of Wetlands and Waterways
627 Main Street
Worcester, MA 01608

Any group of ten persons, any aggrieved person, or any governmental body or
private organization with a mandate to protect the environment who submits written
comments may appeal the Department’s Certification. Failure to submit written
comments before the end of the public comment period may result in the waiver of
any right to an adjudicatory hearing.

return to list of projects or return to top

Raceway Sediment Cap – Holyoke
EEA# 14423

Issued June 19, 2009
Secretary’s Certificate (pdf) – Does not require an Environmental Impact Report

Submitted May 20, 2009
Environmental Notification Form
(pdf)

Comments due June 9, 2009

BEAT note: We do not believe covering up toxic waste (coal tar) with sand and rip rap is a viable solution.

For copies: David Melycher (413) 534-0680
MEPA Analyst: Nicholas Zavolas
(617) 626-1030

return to list of projects or return to top

InteliCoat Technologies – South Hadley

Submitted May 6, 2009
Notice of Public Hearing, re: Proposed Revisions to State Implementation Plan for Ozone

 

return to list of projects or return to top

Walnut Grove Estates – Hadley
EEA# 13849R

Issued May 22, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report

Submitted April 22, 2009
(Resubmitted) Environmental Notification Form
(pdf)

Comments due May 12, 2009

This project is right on the Fort River.

For copies: Michael Liu (413) 582-7000
MEPA Analyst: Holly Johnson (617) 626-1023

return to list of projects or return to top

 

Balise Honda Dealership – West Springfield
EEA# 14410

Issued May 22, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report

Submitted April 22, 2009
Environmental Notification Form
(pdf)

Comments due May 12, 2009

For copies: Kimberly Masiuk (413) 536-0021
MEPA Analyst: William Gage (617) 626-1025

return to list of projects or return to top

Southwest Area Wastewater Treatment Improvements Project – Agawam
EEA# 13393

Issued May 22, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report

Submitted April 22, 2009
Notice of Project Change (pdf)
Comments due May 12, 2009

For copies: David Popielarczyk (413) 572-3233
MEPA Analyst: Nicholas Zavolas (617) 626-1030

return to list of projects or return to top

Indian Orchard Business Park Urban Renewal Plan – Springfield
EEA# 14401

Issued May 8, 2009
Secretary’s Certificate (pdf) – Does not require an Environmental Impact Report

Submitted April 8, 2009
Environmental Notification Form
(pdf)

Comments due April 28, 2009

For copies: Felipe Schwarz (617) 924-1770
MEPA Analyst: Purvi Patel (617) 626-1029

return to list of projects or return to top

Pioneer Renewable Energy – Greenfield
EEA# 14388

Issued April 24, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report

Submitted March 25, 2009
Environmental Notification Form (pdf)
Comments due 4/14/09

For copies: Corinne Snowdon (978) 897-7100
MEPA Analyst: Nicholas Zavolas (617) 626-1030

return to list of projects or return to top

Southwick Parallel Interceptor Project – Westfield
EEA# 14394

Issued April 24, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report

Submitted March 25, 2009
Environmental Notification Form (pdf)
Comments due 4/14/09

For copies: Ronald Michalski (413) 572-3203
MEPA Analyst: Nicholas Zavolas (617) 626-1030

return to list of projects or return to top

Sanitary Landfill Site Assignment – Holyoke/South Hadley

Sanitary Landfill Site Assignment – 21 day comment period

Location – Bartlett Street, South Hadley, Massachusetts

return to list of projects or return to top

Notice of Request for Site Examination – West Springfield

The Town of West Springfield has applied to MassDEP for a Request for Site Exam (pdf)
application for increasing the approved withdrawal for an individual existing public
water supply source from 1.9 mgd to approximately 2.5 mgd of water from the
ground of the Westfield River Basin, in Southwick. I f approved, this increased
individual withdrawal will not change the approved combined withdrawal of 7.01
mgd for the Town’s four existing wells located off Shaker Road, in Southwick. The
existing public water supply well to be tested is PWS Source ID 1325000-01G.

Written comments on the granting of a MassDEP permit to conduct additional
testing of the site for a new or expanded water supply withdrawal are to be filed
within thirty (30) days of publication of this notice in the Environmental Monitor.
The written comments are to be submitted to the Drinking Water Program Section
Chief at the MassDEP Western Regional Office at 436 Dwight Street, Springfield,
Massachusetts 01103.

return to list of projects or return to top

Route 116 (West Street) Reconstruction – Amherst
EEA# 14378

Issued April 10, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report

Submitted March 11, 2009
Environmental Notification Form (pdf)
Comments due March 31, 2009

For copies: Lisa Sherman (401) 457-0366
MEPA Analyst: Purvi Patel (617) 626-1029

return to list of projects or return to top

Robinson Pond Dredging Project – Agawam
EEA# 14377

Issued April 10, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report

Submitted March 11, 2009
Environmental Notification Form (pdf)
Comments due March 31, 2009

For copies: Dan Herzlinger (401) 434-5560
MEPA Analyst: William Gage (617) 626-1025

return to list of projects or return to top

East Street Roadway Improvement Project – Chesterfield
EEA# 14380

Issued April 10, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report

Submitted March 11, 2009
Environmental Notification Form (pdf)
Comments due March 31, 2009

For copies: Matthew Nowak (413) 535-0135
MEPA Analyst: Purvi Patel (617) 626-1029

return to list of projects or return to top

South Hadley Landfill Vertical Expansion – South Hadley
EEA# 10620

Issued April 10, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report

Submitted March 11, 2009
Notice of Project Chagne (pdf)
Comments due March 31, 2009

For copies: Christopher Stahl (717) 533-8600
MEPA Analyst: Aisling Eglington (617) 626-1024

return to list of projects or return to top

Route 181 Transportation Improvement Project – Belchertown
EEA# 14374

Issued March 27, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report

Submitted February 25, 2009
Environmental Notification Form (pdf)
Comments due March 17, 2009

For copies: Jessie Wilson (617) 973-8281
MEPA Analyst: Purvi Patel (617) 626-1029

return to list of projects or return to top

Long Term CSO Control Plan – Chicopee
EEA# 12283

Issued December 2, 2009
Secretary’s Certificate (pdf)
Adequately and properly complies with MEPA

Submitted November 9, 2009
Final Environmental Impact Report
(no pdf available)
Comments due Novmeber 25, 2009

Issued April 24, 2009
Secretary has granted a Phase 1 Waiver(pdf)

Issued April 4, 2009
Secretary proposes to grant a Phase 1 Waiver (pdf)
Comments due April 22, 2009

Issued April 4, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report

Submitted February 25, 2009
Notice of Project Change (pdf)
Comments due March 27, 2009

For copies: Tiffany Labrie (413) 572-3248
MEPA Analyst: William Gage (617) 626-1025

return to list of projects or return to top

Little River Streambank Restoration Project – Westfield
EEA#14452

Issued August 7, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report

Submitted July 8, 2009
Environmental Notification Form
Comments due July 28, 2009

For copies: Benjamin Nichols (617) 973-8245
MEPA Analyst: Aisling Eglington (617) 626-1024

——————————

Submitted February 11, 2009
Mass Highway 401 Water Quality Certification application (pdf)
21 day comment period from 2/11/09

Pursuant to 33 U.S.C. 1341 M.G.L. c. 21 S 43, notice is given of a 401 Water Quality
Certification application for the Little River Streambank Restoration Project, as proposed
by the Massachusetts Highway Department (MHD) located at the MHD District 2
Maintenance Facility #26. The application pertains to the stabilization of an eroding bank
along the Little River using bioengineering techniques. Additional information may be
obtained from the Massachusetts Highway Department at the above address, Attention
Susan McArthur, (617) 973-7434. Written comments should be sent to DEP,
Commissioner’s Office, Attention Derek Standish, Boston Region, 1 Winter Street, 3’d
floor, Boston, MA 02108 within 21 days of this notice. Any group of ten persons, any
aggrieved person, or any governmental body or private organization with a mandate to
protect the environment who submits written comments may appeal the Department’s
Certification. Failure to submit written comments before the end of the public comment
period may result in the waiver of any right to an adjudicatory hearing.

return to list of projects or return to top

Pioneer Valley Energy Center – Westfield
EEA# 14151

posted December 23, 2009
Notice of Issuance of Section 61 Finding and Final Permit for Industrial Sewer Use (pdf)

Issued March 6, 2009
Secretary’s Certificate (pdf) – Adequately and properly complies with MEPA

Submitted January 27, 2009
Final Environmental Impact Report – not available on line
Comments due February 27, 2009

For copies: Dammon Frecker (781) 489-1146
MEPA Analyst: Holly Johnson (617) 626-1023

return to list of projects or return to top

Bridge replacement at Route 112 over Griswoldville Canal – Colrain

Pursuant to 33 U.S.C. 1341 M.G.L. c. 21 S 43, notice is given of a 401 Water Quality Certification application for the replacement of Bridge C-18-023 at Route 112 over Griswoldville Canal in the town of Colrain, Massachusetts by the MassHighway Department, Ten Park Plaza, Room 4260, Boston, MA 02116.

This project will involve the replacement of the existing bridge with a new bridge structure. Additional information may be obtained from the Massachusetts Highway Department at the above address, Attention Timothy Dexter, (6 17) 973-8306.

Written comments should be sent to DEP, Division of Wetlands and Waterways, Attention Derek Standish, Boston Region, One Winter Street, 3rd Floor, Boston, MA 02108 within 21 days of this notice.

Any group of ten persons, any aggrieved person, or any governmental body or private organization with a mandate to protect the environment who submits written comments may appeal the Department’s Certification. Failure to submit written comments before the end of the public comment period may result in the waiver of any right to an adjudicatory hearing.

return to list of projects or return to top

Bridge replacement at Haydenville Road as it crosses West Brook – Whatley

Pursuant to 33 U.S.C. 1341 M.G.L. c. 21 S 43, notice is given of a 401 Water Quality Certification application for the replacement of Bridge W-33-009 at Haydenville Road as it crosses West Brook in the town of Whately, Massachusetts by the MassHighway Department, Ten Park Plaza, Room 4260, Boston, MA 02116.

This project will involve the replacement of the existing bridge with a new bridge structure. Additional
information may be obtained from the Massachusetts Highway Department at the above address, Attention Timothy Dexter, (617) 973-8306.

Written comments should be sent to DEP, Division of Wetlands and Waterways, Attention Derek Standish, Boston Region, One Winter Street, 3rd Floor, Boston, MA 02108 within 21 days of this notice.

Any group of ten persons, any aggrieved person, or any governmental body or private organization with a mandate to protect the environment who submits written comments may appeal the Department’s Certification. Failure to submit written comments before the end of the public comment period may result in the waiver of any right to an adjudicatory hearing.

return to list of projects or return to top

Agawam to West Springfield Circuit Separation Project – Agawam and West Springfield – 1/7/09
EEA# 14355

Issued February 6, 2009
Secretary’s Certificate (pdf) – Does not require an Environmental Impact Report

Submitted January 7, 2009

Environmental Notification Form (pdf)
Comments due January 27, 2009

For copies: Eastin Meyer (203) 284-8590
MEPA Analyst: Holly Johnson (617) 626-1023

return to list of projects or return to top

Williston Pond Restoration Project – Easthampton
EEA# 14357

Issued February 6, 2009
Secretary’s Certificate (pdf) – Does not require an Environmental Impact Report

Submitted January 7, 2009
Environmental Notification Form (pdf)
Comments due January 27, 2009

For copies: Anja Ryan (413) 525-3822
MEPA Analyst: Nicholas Zavolas (617) 626-1030

return to list of projects or return to top

Stop & Shop Supermarket – Easthampton
EEA# 14358

Issued February 6, 2009
Secretary’s Certificate (pdf) – Requires an Environmental Impact Report

Submitted January 7, 2009
Environmental Notification Form (pdf)
Comments due January 27, 2009

For copies: Stephen Brewer (603) 766-4598
MEPA Analyst: Nicholas Zavolas (617) 626-1030

return to list of projects or return to top

Route 2 Transportation Improvement Project – Orange, Athol and Phillipston – 1/7/09
EEA# 11870

Issued March 20, 2009
Secretary’s Certificate (pdf) – Adequately and properly complies with MEPA

Submitted January 7, 2009
Single Environmental Impact Report (pdf)
Comments now due March 13, 2009

BEAT comment:

BEAT received a copy of the SEIR to review. – This is pretty horrible – The parts of this project that are in Athol and Phillipston are already done! The EIR lacks sufficient detail to determine what the impact will be. The wetland replacement area that they are proposing for Orange is in the middle of a loop of road (an on/off ramp circle) – but they will include one “wildlife passage” into/out of this loop. That is not a viable wetland replacement area in BEAT’s opinion.

Mass Highway was allowed to do 2/3 of this project without any filing because they were, in theory, just making the highway safe while they were planning to widen the highway to a double barrel highway. While the safety widening was less of an impact, it should not have been allowed to proceed without proper MEPA review in BEAT’s opinion.

This EIR lacks sufficient detail. The proponent should be required to submit a Final EIR and include a thorough assessment with detailed photographs of the two wetland replacement areas that were already built.

In the meantime, there are wetland replacement areas in Athol and Phillipston that were built for this project. Is there anyone out there who can take a look at these two areas to see what they are like? Do they have good wetland hydrology? Are they supporting native, wetland plants? Are animals making use of the areas?

For copies: John Yaney (617) 723-8882
MEPA Analyst: Deirdre Buckley (617) 626-1044

return to list of projects or return to top

Greater Springfield Reliability Project – Springfield, West Springfield, Agawam, Chicopee and Ludlow – 1/7/09
EEA# 14271

Issued February 13, 2009
Secretary’s Certificate (pdf) – Adequately and properly complies with MEPA

Submitted January 7, 2009
Draft Environmental Impact Report – no link
Comments due February 6, 2009

Issued August 1, 2008
Secretary’s Certificate (pdf) Requires an Environmental Impact Report

Submitted June 25, 2008
Environmental Notification Form (pdf)
Comments due July 25, 2008

For copies: Jerry Fan (203) 284-8590
MEPA Analyst: Briony Angus (617) 626-1029

return to list of projects or return to top

Long-Term Combined Sewer Overflow Control Plan – Springfield – 1/9/09
EEA# 11525

Issued January 9, 2009
Record of Decision (pdf)
– Secretary has granted a Phase 1 Waiver

Draft Record of Decision (pdf) – Secretary proposes to grant a Phase 1 Waiver
Comments due January 7, 2009

Issued December 24, 2008
Secretary’s Certificate (pdf) – Does not require an Environmental Impact Report

Notice of Project Change (pdf)
Comments due December 15, 2008

For copies: Joseph Superneau (413) 787-6526 x152
MEPA Analyst: William Gage (617) 626-1025

return to list of projects or return to top

How to Submit Comments to MEPA:

The Secretary of Environmental Affairs accepts written comments on projects currently under MEPA review. Comments may be submitted electronically, by mail, via FAX, or by hand delivery. Please note that comments submitted on MEPA documents are public records.

Be sure to include the EOEA number on all comments!

The mailing address for comments is:
Ian A. Bowles, Secretary of Environment and Energy
Attn: MEPA Office
[Analyst Name], EOEA No. ____
100 Cambridge Street, Suite 900
Boston MA 02114

Be sure to include the EOEA number on all comments!

state email addresses are usually: first name.last name @state.ma.us
for example: Aisling.Eglington@state.ma.us

return to list of projects, or return to list of state projects, or top of page

Back To Top