- Current Environmental Monitor on MEPA website
- Connecticut River Valley Environmental Monitor Archive: 2012, 2011, 2010, – 2008
- Berkshire Environmental Monitor Archive: 2007, 2006
- Westfield – Pioneer Valley Energy Center – Notice of Issuance of Section 61 Finding and Final Permit for Industrial Sewer Use (pdf) posted 12/23/09
- Russell, Montgomery and Westfield – Russell Biomass – SEIR – comments due 1/08/2010
- Brimfield – Notice of Application for a 401 Water Quality Certification (pdf) – replacement of Bridge B-24-006 which carries Wales Road (Route 19) over Mill Brook – posted 12/9/09
- Northampton – Three County Fairgrounds Redevelopment – ENF – comments due 12/14/09
- Springfield, West Springfield, Agawam, Chicopee and Ludlow – Greater Springfield Reliability Project – FEIR – comments due 12/23/09
- Chicopee – Long Term CSO Control Plan – Certificate 12/02/09- Adequately and properly complies with MEPA
Previous 2009 listings:
- Peru, Windsor, Plainfield, Ashfield, and Amherst – Notice of Application for a 401 Water Quality Certification (pdf) – repair or replacement of twenty-four lattice structures in poor condition along the transmission right-of-way by Northeast Utilities/WMECo – posted 11/23/09
- Leverett, Shutesbury and Pelham – Notice of Application for a 401 Water Quality Certification (pdf) 11/9/09
- Agawam and West Springfield – Notice of Application for a Chapter 91 License (pdf) – WMECo Transmission lines including 3 crossings of the Westfield River – 10/26/09
- Holyoke – Hazen Paper Co.- Notice of Issuance of Draft Operating Permit Renewal (pdf) – 10/26/09
- Colrain – Notice of Application for a 401 Water Quality Certification (pdf) – Rehabilitation of bridge on Rt 112 over the East Branch of the North River – 10/26/09
- Springfield – South End Urban Renewal Plan, Amendment No. 8 – Certificate – 10/23/09 – Does not require an Environmental Impact Report
- Westfield – Town Roadway Improvement Project – ENF Certificate – 09/25/09- Does not require an Environmental Impact Report
- Blandford – Notice of Application for a 401 Water Quality Certification (pdf) submitted 9/9/09 – WMECo Line Structure Replacement
- Chicopee – Notice of Application for a 401 Water Quality Certification (pdf) submitted 9/9/09 – Replacement of the Davitt Memorial Bridge, Rt 116 over the Chicopee River
- Springfield – Reconstruction of Lower Van Horn Reservoir Dam – Secretary’s Certificate issued 9/11/09 – Does not require an Environmental Impact Report
- Russell – Russell Biomass Power Plant – Notice of Project Change – Certificate – issued 8/7/09 – Requires an Environmental Impact Report
- Westfield – Little River Streambank Restoration Project – Certificate – issued 8/7/09 – Does not require an Environmental Impact Report
- New Salem – Proposed Single Family House – Certificate – issued 7/24/09 – Does not require an Environmental Impact Report
- South Hadley – Connecticut Valley Sanitary Waste Disposal, Inc. – Notice of Issuance of a Draft Operating Permit (Renewal)(pdf) – in 8/12/09 Monitor
- South Hadley – South Hadley Landfill – Notice of Solid Waste Facility Review (pdf) in 7/22/09 Monitor
- Williamsburg – Notice of Application for a 401 Water Quality Certification (pdf) – repair of Bridge on Route 143 over west branch Mill River – submitted 7/8/09
- Amherst – Notice of Application for a Pumping Test (pdf) – for testing an existing public water supply off of Warren Wright Road in Belchertown – submitted 6/24/09
- West Springfield – Notice of Issuance of a Draft Operating Permit (Renewal) (pdf) – Fountain Plating Company – submitted 6/24/09 – submitted 6/24/09
- Buckland – Notice of Application for a 401 Water Quality Certification (pdf) – repair of Bridge on Route 112 over Clesson Brook – submitted 6/24/09
- Orange – Notice of Application for a 401 Water Quality Certification (pdf) – road widening Route 2 in the Town of Orange – submitted 6/24/09
- Easthampton – Notice of Application for a 401 Water Quality Certification (pdf) – replacement of Bridge at Hendrick Street over Broad Brook – submitted 6/10/09
- Blandford – Notice of Application for a 401 Water Quality Certification (pdf) – WMECo Utility Pole – submitted 6/10/09
- Granby – Granby Landfill – Notice of Issuance of a Draft Operating Permit (Renewal) – submitted 5/20/09
- Holyoke – Raceway Sediment Cap – Certificate issued 6/19/09 – Does not require an Environmental Impact Report
- Hadley – Walnut Grove Estates – Certificate issued 5/22/09 – Does not require an Environmental Impact Report
- West Springfield – Balise Honda Dealership –Certificate issued 5/22/09 – Does not require an Environmental Impact Report
- Agawam – Southwest Area Wastewater Treatment Improvements Project – Does not require an Environmental Impact Report Does not require an Environmental Impact Report
- Springfield – Indian Orchard Business Park Urban Renewal Plan – Certificate issued 5/8/09 – Does not require an Environmental Impact Report
- Belchertown, Granby and Ludlow – Notice of Application for a 401 Water Quality Certification – WMECo – submitted 5/20/09
- South Hadley – InteliCoat Technologies – Notice of Public Hearing, re: Proposed Revisions to State Implementation Plan for Ozone – submitted 5/6/09
- Massachusetts Turnpike Authority – Notice of Submission of a Yearly Operational Plan (pdf) – comments due by 5/22/09
- Pioneer Valley Railroad Company – Notice of Submission of a Yearly Operational Plan (pdf) – comments due by 5/22/09
- Greenfield – Pioneer Renewable Energy – 4/24/09 – Does not require an Environmental Impact Report
- Westfield – Southwick Parallel Interceptor Project– 4/24/09 – Does not require an Environmental Impact Report
- Amherst – Route 116 (West Street) Reconstruction – 4/10/09 – Does not require an Environmental Impact Report
- Agawam – Robinson Pond Dredging Project – 4/10/09 – Does not require an Environmental Impact Report
- Chesterfield – East Street Roadway Improvement Project – 4/10/09 – Does not require an Environmental Impact Report
- South Hadley – South Hadley Landfill Vertical Expansion – 4/10/09 – Does not require an Environmental Impact Report
- Chicopee – Long Term CSO Control Plan – NPC – Certificate issued 4/24/09 – Secretary granted a Phase 1 Waiver
- South Hadley / Holyoke – Sanitary Landfill Site Assignment – 21 day comment period
- West Springfield – Notice of Request for Site Examination – filed 3/11/09 – 30 day comment period
- Belchertown – Route 181 Transportation Improvement Project – ENF – Certificate issued 3/27/09 – Does not require an Environmental Impact Report
- Hadley – Lowe’s of Hadley (EEA #13539) – Notice of Issuance of Amended Section 61 Finding (pdf)
- Holyoke – City of Holyoke Gas and Electric Yearly Operational Plan (pdf) – submitted 2/25/09
- Orange, Athol and Phillipston – Route 2 Transportation Improvement Project – Certificate Issued – EIR – Adequately and properly complies with MEPA
- Westfield – Pioneer Valley Energy Center – FEIR – Certificate Issued – EIR – Adequately and properly complies with MEPA
- Westfield – Little River Streambank Restoration Project – Mass Highway 401 Water Quality
Certification application – 21 day comment period from 2/11/09 - Colrain – Bridge replacement at Route 112 over Griswoldville Canal – 401 WQ Cert. – comments due 21 days from 1/21/09
- Whately – Bridge replacement at Haydenville Road as it crosses West Brook – 401 WQ Cert. – comments due 21 days from 1/21/09
- Agawam and West Springfield –Agawam to West Springfield Circuit Separation Project – ENF – 2/6/09 Certificate – Does not require an Environmental Impact Report
- Easthampton – Williston Pond Restoration Project – ENF – 2/6/09 Certificate – Does not require an Environmental Impact Report
- Easthampton – Stop & Shop Supermarket – ENF – 2/6/09 Certificate – Requires an Environmental Impact Report
- Springfield, West Springfield, Agawam, Chicopee and Ludlow – Greater Springfield Reliability Project – DEIR – 2/13/09 Certificate – Adequately and properly complies with MEPA
- Springfield – Long-Term Combined Sewer Overflow Control Plan – NPC – Secretary has granted a Phase I Waiver
return to list of projects or return to top
Three County Fairgrounds Redevelopment – Northampton
EEA# 14509
Submitted November 23, 2009
Environmental Notification Form (pdf)
Comments due December 14, 2009
Site visit – 11/30/2009 – 10:00 AM – at the Project Site – Fair Street, Northampton
For copies: Jeff Squire (413) 582-7000
MEPA Analyst: Aisling Eglington (617) 626-1024
return to list of projects or return to top
Greater Springfield Reliability Project – Springfield, West Springfield, Agawam, Chicopee and Ludlow – 1/7/09
EEA# 14271
Submitted November 23, 2009
Final Environmental Impact Report – no pdf on line
Comments due December 23, 2009
For copies: Robert Carberry (860) 665-6774
MEPA Analyst:
Holly Johnson (617) 626-1023
Issued February 13, 2009
Secretary’s Certificate (pdf) – Adequately and properly complies with MEPA
Submitted January 7, 2009
Draft Environmental Impact Report – no link
Comments due February 6, 2009
Issued August 1, 2008
Secretary’s Certificate (pdf) Requires an Environmental Impact Report
Submitted June 25, 2008
Environmental Notification Form (pdf)
Comments due July 25, 2008
Originally one was to contact for copies: Jerry Fan (203) 284-8590
MEPA Analyst for the original was Briony Angus
return to list of projects or return to top
South End Urban Renewal Plan, Amendment No. 8 – Springfield
EEA# 14488
Issued October 23, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report
Submitted September 23, 2009
Environmental Notification Farm (pdf)
Comments due October 13, 2009
For copies: Samalid Hogan (413) 787-6020
MEPA Analyst: Purvi Patel (617) 626-1029
return to list of projects or return to top
Town Roadway Improvement Project – Westfield
EEA#
14473
Issued September 25, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report
Submitted August 26, 2009
Environmental Notification Form (pdf)
Comments due September 15, 2009
For copies: Jessie Wilson (617) 973-8281
MEPA Analyst: William Gage (617) 626-1025
return to list of projects or return to top
Reconstruction of Lower Van Horn Reservoir Dam – Springfield
EEA# 14470
Issued September 11, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report
Submitted August 12, 2009
Environmental Notification Farm (pdf)
Comments due September 1, 2009
For copies: Anja Ryan (413) 525-3822
MEPA Analyst: Nicholas Zavolas (617) 626-1030
return to list of projects or return to top
Proposed Single Family House – New Salem
EEA# 14433
Issued July 24, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report
Submitted June 24, 2009
Environmental Notification Farm (pdf)
Comments due July 14, 2009
For copies: Robert Stover (413) 256-3400
MEPA Analyst: Nicholas Zavolas (617) 626-1030
return to list of projects or return to top
Russell Biomass Power Plant – Russell
EEA# 13635
Submitted December 9, 2009
Supplemental Environmental Impact Report no link provided
Comments due January 8, 2010
Issued August 7, 2009
Secretary’s Certificate (pdf)
Requires an Environmental Impact Report
Submitted June 10, 2009
Notice of Project Change (pdf)
Comments due June 30, 2009
Note there were previous submissions in prior years. Below is the MEPA table of “Action Information” on this project:
Submission | Monitor Vol No. | Monitor Date | Comments Due Date | Action | Action Date | Comments |
---|---|---|---|---|---|---|
ENF | 64-10 | 09/24/2005 | 10/24/2005 | EIR | 10/31/2005 | |
DEIR | 68-05 | 07/11/2007 | 08/24/2007 | ADEQAT | 09/07/2007 | NPC/DEIR |
FEIR | 69-08 | 02/20/2008 | 03/21/2008 | ADEQAT | 03/28/2008 | |
PC | 73-03 | 06/30/2009 | 06/30/2009 | EIR | 08/07/2009 | |
SEIR | 73-03 | 12/09/2009 | 01/08/2010 |
For copies: Rebecca Sherer or Tracy Adamski (413) 562-1600
MEPA Analyst: Aisling Eglington (617) 626-1024
return to list of projects or return to top
Granby Landfill – Granby
Submitted May 20, 2009
Notice of Issuance of a Draft Operating Permit (Renewal) (pdf)
return to list of projects or return to top
Western Mass. Electric Co – Belchertown, Granby and Ludlow –
Submitted May 20, 2009
Notice of Application for a 401 Water Quality Certification
Pursuant to M.G.L. c. 21 943, an application for 401 Water Quality Certification is
pending before the Department of Environmental Protection for the 354 Line
Structure Replacement Project. The applicant is Western Massachusetts Electric
Company, c/o Northeast Utilities, P.O. Box 270, Hartford, CT 06141-0270. ‘the
project involves the replacement of eight (8) electrical utility pole structures along
the #354 345 kV transmission line between Erving and Ludlow, Massachusetts.
Work which requires the filing of a 401 Water Quality Certification will occur in the
communities of Belchertown, Granby and Ludlow. Additional information may be
obtained from the applicant’s agent – Tighe & Bond, Inc. c/o Daniel Rukakoski, PWS
(413-875-1312). Written comments should be addressed within 21 days of this
notice to:
Massachusetts Department of Environmental Protection
Western Regional Office
Division of Wetlands and Waterways
627 Main Street
Worcester, MA 01608
Any group of ten persons, any aggrieved person, or any governmental body or
private organization with a mandate to protect the environment who submits written
comments may appeal the Department’s Certification. Failure to submit written
comments before the end of the public comment period may result in the waiver of
any right to an adjudicatory hearing.
return to list of projects or return to top
Raceway Sediment Cap – Holyoke
EEA# 14423
Issued June 19, 2009
Secretary’s Certificate (pdf) – Does not require an Environmental Impact Report
Submitted May 20, 2009
Environmental Notification Form
(pdf)
Comments due June 9, 2009
BEAT note: We do not believe covering up toxic waste (coal tar) with sand and rip rap is a viable solution.
For copies: David Melycher (413) 534-0680
MEPA Analyst: Nicholas Zavolas
(617) 626-1030
return to list of projects or return to top
InteliCoat Technologies – South Hadley
Submitted May 6, 2009
Notice of Public Hearing, re: Proposed Revisions to State Implementation Plan for Ozone
return to list of projects or return to top
Walnut Grove Estates – Hadley
EEA# 13849R
Issued May 22, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report
Submitted April 22, 2009
(Resubmitted) Environmental Notification Form
(pdf)
Comments due May 12, 2009
This project is right on the Fort River.
For copies: Michael Liu (413) 582-7000
MEPA Analyst: Holly Johnson (617) 626-1023
return to list of projects or return to top
Balise Honda Dealership – West Springfield
EEA# 14410
Issued May 22, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report
Submitted April 22, 2009
Environmental Notification Form
(pdf)
Comments due May 12, 2009
For copies: Kimberly Masiuk (413) 536-0021
MEPA Analyst: William Gage (617) 626-1025
return to list of projects or return to top
Southwest Area Wastewater Treatment Improvements Project – Agawam
EEA# 13393
Issued May 22, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report
Submitted April 22, 2009
Notice of Project Change (pdf)
Comments due May 12, 2009
For copies: David Popielarczyk (413) 572-3233
MEPA Analyst: Nicholas Zavolas (617) 626-1030
return to list of projects or return to top
Indian Orchard Business Park Urban Renewal Plan – Springfield
EEA# 14401
Issued May 8, 2009
Secretary’s Certificate (pdf) – Does not require an Environmental Impact Report
Submitted April 8, 2009
Environmental Notification Form
(pdf)
Comments due April 28, 2009
For copies: Felipe Schwarz (617) 924-1770
MEPA Analyst: Purvi Patel (617) 626-1029
return to list of projects or return to top
Pioneer Renewable Energy – Greenfield
EEA# 14388
Issued April 24, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report
Submitted March 25, 2009
Environmental Notification Form (pdf)
Comments due 4/14/09
For copies: Corinne Snowdon (978) 897-7100
MEPA Analyst: Nicholas Zavolas (617) 626-1030
return to list of projects or return to top
Southwick Parallel Interceptor Project – Westfield
EEA# 14394
Issued April 24, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report
Submitted March 25, 2009
Environmental Notification Form (pdf)
Comments due 4/14/09
For copies: Ronald Michalski (413) 572-3203
MEPA Analyst: Nicholas Zavolas (617) 626-1030
return to list of projects or return to top
Sanitary Landfill Site Assignment – Holyoke/South Hadley
Sanitary Landfill Site Assignment – 21 day comment period
Location – Bartlett Street, South Hadley, Massachusetts
return to list of projects or return to top
Notice of Request for Site Examination – West Springfield
The Town of West Springfield has applied to MassDEP for a Request for Site Exam (pdf)
application for increasing the approved withdrawal for an individual existing public
water supply source from 1.9 mgd to approximately 2.5 mgd of water from the
ground of the Westfield River Basin, in Southwick. I f approved, this increased
individual withdrawal will not change the approved combined withdrawal of 7.01
mgd for the Town’s four existing wells located off Shaker Road, in Southwick. The
existing public water supply well to be tested is PWS Source ID 1325000-01G.
Written comments on the granting of a MassDEP permit to conduct additional
testing of the site for a new or expanded water supply withdrawal are to be filed
within thirty (30) days of publication of this notice in the Environmental Monitor.
The written comments are to be submitted to the Drinking Water Program Section
Chief at the MassDEP Western Regional Office at 436 Dwight Street, Springfield,
Massachusetts 01103.
return to list of projects or return to top
Route 116 (West Street) Reconstruction – Amherst
EEA# 14378
Issued April 10, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report
Submitted March 11, 2009
Environmental Notification Form (pdf)
Comments due March 31, 2009
For copies: Lisa Sherman (401) 457-0366
MEPA Analyst: Purvi Patel (617) 626-1029
return to list of projects or return to top
Robinson Pond Dredging Project – Agawam
EEA# 14377
Issued April 10, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report
Submitted March 11, 2009
Environmental Notification Form (pdf)
Comments due March 31, 2009
For copies: Dan Herzlinger (401) 434-5560
MEPA Analyst: William Gage (617) 626-1025
return to list of projects or return to top
East Street Roadway Improvement Project – Chesterfield
EEA# 14380
Issued April 10, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report
Submitted March 11, 2009
Environmental Notification Form (pdf)
Comments due March 31, 2009
For copies: Matthew Nowak (413) 535-0135
MEPA Analyst: Purvi Patel (617) 626-1029
return to list of projects or return to top
South Hadley Landfill Vertical Expansion – South Hadley
EEA# 10620
Issued April 10, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report
Submitted March 11, 2009
Notice of Project Chagne (pdf)
Comments due March 31, 2009
For copies: Christopher Stahl (717) 533-8600
MEPA Analyst: Aisling Eglington (617) 626-1024
return to list of projects or return to top
Route 181 Transportation Improvement Project – Belchertown
EEA# 14374
Issued March 27, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report
Submitted February 25, 2009
Environmental Notification Form (pdf)
Comments due March 17, 2009
For copies: Jessie Wilson (617) 973-8281
MEPA Analyst: Purvi Patel (617) 626-1029
return to list of projects or return to top
Long Term CSO Control Plan – Chicopee
EEA# 12283
Issued December 2, 2009
Secretary’s Certificate (pdf)
Adequately and properly complies with MEPA
Submitted November 9, 2009
Final Environmental Impact Report
(no pdf available)
Comments due Novmeber 25, 2009
Issued April 24, 2009
Secretary has granted a Phase 1 Waiver(pdf)
Issued April 4, 2009
Secretary proposes to grant a Phase 1 Waiver (pdf)
Comments due April 22, 2009
Issued April 4, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report
Submitted February 25, 2009
Notice of Project Change (pdf)
Comments due March 27, 2009
For copies: Tiffany Labrie (413) 572-3248
MEPA Analyst: William Gage (617) 626-1025
return to list of projects or return to top
Little River Streambank Restoration Project – Westfield
EEA#14452
Issued August 7, 2009
Secretary’s Certificate (pdf)
Does not require an Environmental Impact Report
Submitted July 8, 2009
Environmental Notification Form
Comments due July 28, 2009
For copies: Benjamin Nichols (617) 973-8245
MEPA Analyst: Aisling Eglington (617) 626-1024
——————————
Submitted February 11, 2009
Mass Highway 401 Water Quality Certification application (pdf)
21 day comment period from 2/11/09
Pursuant to 33 U.S.C. 1341 M.G.L. c. 21 S 43, notice is given of a 401 Water Quality
Certification application for the Little River Streambank Restoration Project, as proposed
by the Massachusetts Highway Department (MHD) located at the MHD District 2
Maintenance Facility #26. The application pertains to the stabilization of an eroding bank
along the Little River using bioengineering techniques. Additional information may be
obtained from the Massachusetts Highway Department at the above address, Attention
Susan McArthur, (617) 973-7434. Written comments should be sent to DEP,
Commissioner’s Office, Attention Derek Standish, Boston Region, 1 Winter Street, 3’d
floor, Boston, MA 02108 within 21 days of this notice. Any group of ten persons, any
aggrieved person, or any governmental body or private organization with a mandate to
protect the environment who submits written comments may appeal the Department’s
Certification. Failure to submit written comments before the end of the public comment
period may result in the waiver of any right to an adjudicatory hearing.
return to list of projects or return to top
Pioneer Valley Energy Center – Westfield
EEA# 14151
posted December 23, 2009
Notice of Issuance of Section 61 Finding and Final Permit for Industrial Sewer Use (pdf)
Issued March 6, 2009
Secretary’s Certificate (pdf) – Adequately and properly complies with MEPA
Submitted January 27, 2009
Final Environmental Impact Report – not available on line
Comments due February 27, 2009
For copies: Dammon Frecker (781) 489-1146
MEPA Analyst: Holly Johnson (617) 626-1023
return to list of projects or return to top
Bridge replacement at Route 112 over Griswoldville Canal – Colrain
Pursuant to 33 U.S.C. 1341 M.G.L. c. 21 S 43, notice is given of a 401 Water Quality Certification application for the replacement of Bridge C-18-023 at Route 112 over Griswoldville Canal in the town of Colrain, Massachusetts by the MassHighway Department, Ten Park Plaza, Room 4260, Boston, MA 02116.
This project will involve the replacement of the existing bridge with a new bridge structure. Additional information may be obtained from the Massachusetts Highway Department at the above address, Attention Timothy Dexter, (6 17) 973-8306.
Written comments should be sent to DEP, Division of Wetlands and Waterways, Attention Derek Standish, Boston Region, One Winter Street, 3rd Floor, Boston, MA 02108 within 21 days of this notice.
Any group of ten persons, any aggrieved person, or any governmental body or private organization with a mandate to protect the environment who submits written comments may appeal the Department’s Certification. Failure to submit written comments before the end of the public comment period may result in the waiver of any right to an adjudicatory hearing.
return to list of projects or return to top
Bridge replacement at Haydenville Road as it crosses West Brook – Whatley
Pursuant to 33 U.S.C. 1341 M.G.L. c. 21 S 43, notice is given of a 401 Water Quality Certification application for the replacement of Bridge W-33-009 at Haydenville Road as it crosses West Brook in the town of Whately, Massachusetts by the MassHighway Department, Ten Park Plaza, Room 4260, Boston, MA 02116.
This project will involve the replacement of the existing bridge with a new bridge structure. Additional
information may be obtained from the Massachusetts Highway Department at the above address, Attention Timothy Dexter, (617) 973-8306.
Written comments should be sent to DEP, Division of Wetlands and Waterways, Attention Derek Standish, Boston Region, One Winter Street, 3rd Floor, Boston, MA 02108 within 21 days of this notice.
Any group of ten persons, any aggrieved person, or any governmental body or private organization with a mandate to protect the environment who submits written comments may appeal the Department’s Certification. Failure to submit written comments before the end of the public comment period may result in the waiver of any right to an adjudicatory hearing.
return to list of projects or return to top
Agawam to West Springfield Circuit Separation Project – Agawam and West Springfield – 1/7/09
EEA# 14355
Issued February 6, 2009
Secretary’s Certificate (pdf) – Does not require an Environmental Impact Report
Submitted January 7, 2009
Environmental Notification Form (pdf)
Comments due January 27, 2009
For copies: Eastin Meyer (203) 284-8590
MEPA Analyst: Holly Johnson (617) 626-1023
return to list of projects or return to top
Williston Pond Restoration Project – Easthampton
EEA# 14357
Issued February 6, 2009
Secretary’s Certificate (pdf) – Does not require an Environmental Impact Report
Submitted January 7, 2009
Environmental Notification Form (pdf)
Comments due January 27, 2009
For copies: Anja Ryan (413) 525-3822
MEPA Analyst: Nicholas Zavolas (617) 626-1030
return to list of projects or return to top
Stop & Shop Supermarket – Easthampton
EEA# 14358
Issued February 6, 2009
Secretary’s Certificate (pdf) – Requires an Environmental Impact Report
Submitted January 7, 2009
Environmental Notification Form (pdf)
Comments due January 27, 2009
For copies: Stephen Brewer (603) 766-4598
MEPA Analyst: Nicholas Zavolas (617) 626-1030
return to list of projects or return to top
Route 2 Transportation Improvement Project – Orange, Athol and Phillipston – 1/7/09
EEA# 11870
Issued March 20, 2009
Secretary’s Certificate (pdf) – Adequately and properly complies with MEPA
Submitted January 7, 2009
Single Environmental Impact Report (pdf)
Comments now due March 13, 2009
BEAT comment:
BEAT received a copy of the SEIR to review. – This is pretty horrible – The parts of this project that are in Athol and Phillipston are already done! The EIR lacks sufficient detail to determine what the impact will be. The wetland replacement area that they are proposing for Orange is in the middle of a loop of road (an on/off ramp circle) – but they will include one “wildlife passage” into/out of this loop. That is not a viable wetland replacement area in BEAT’s opinion.
Mass Highway was allowed to do 2/3 of this project without any filing because they were, in theory, just making the highway safe while they were planning to widen the highway to a double barrel highway. While the safety widening was less of an impact, it should not have been allowed to proceed without proper MEPA review in BEAT’s opinion.
This EIR lacks sufficient detail. The proponent should be required to submit a Final EIR and include a thorough assessment with detailed photographs of the two wetland replacement areas that were already built.
In the meantime, there are wetland replacement areas in Athol and Phillipston that were built for this project. Is there anyone out there who can take a look at these two areas to see what they are like? Do they have good wetland hydrology? Are they supporting native, wetland plants? Are animals making use of the areas?
For copies: John Yaney (617) 723-8882
MEPA Analyst: Deirdre Buckley (617) 626-1044
return to list of projects or return to top
Greater Springfield Reliability Project – Springfield, West Springfield, Agawam, Chicopee and Ludlow – 1/7/09
EEA# 14271
Issued February 13, 2009
Secretary’s Certificate (pdf) – Adequately and properly complies with MEPA
Submitted January 7, 2009
Draft Environmental Impact Report – no link
Comments due February 6, 2009
Issued August 1, 2008
Secretary’s Certificate (pdf) Requires an Environmental Impact Report
Submitted June 25, 2008
Environmental Notification Form (pdf)
Comments due July 25, 2008
For copies: Jerry Fan (203) 284-8590
MEPA Analyst: Briony Angus (617) 626-1029
return to list of projects or return to top
Long-Term Combined Sewer Overflow Control Plan – Springfield – 1/9/09
EEA# 11525
Issued January 9, 2009
Record of Decision (pdf) – Secretary has granted a Phase 1 Waiver
Draft Record of Decision (pdf) – Secretary proposes to grant a Phase 1 Waiver
Comments due January 7, 2009
Issued December 24, 2008
Secretary’s Certificate (pdf) – Does not require an Environmental Impact Report
Notice of Project Change (pdf)
Comments due December 15, 2008
For copies: Joseph Superneau (413) 787-6526 x152
MEPA Analyst: William Gage (617) 626-1025
return to list of projects or return to top
The Secretary of Environmental Affairs accepts written comments on projects currently under MEPA review. Comments may be submitted electronically, by mail, via FAX, or by hand delivery. Please note that comments submitted on MEPA documents are public records.
Be sure to include the EOEA number on all comments!
The mailing address for comments is:
Ian A. Bowles, Secretary of Environment and Energy
Attn: MEPA Office
[Analyst Name], EOEA No. ____
100 Cambridge Street, Suite 900
Boston MA 02114Be sure to include the EOEA number on all comments!
state email addresses are usually: first name.last name @state.ma.us
for example: Aisling.Eglington@state.ma.usreturn to list of projects, or return to list of state projects, or top of page