Presented below are the first two pages of a preliminary
report prepared by SK Design in just 24 hours. The report reads in part:
"Based upon our review of the
above documents, the project has been properly permitted.
The permitting was prepared by a Professional Engineer
and included review by the Massachusetts Department of
Environmental Protection Wetlands Division, the Natural
Heritage and Endangered Species Program, and the
Pittsfield conservation Commission. The application was
brief in nature and did not include a wetland delineation
or a detailed topographic map. Regardless of the brief
application and lack of a grading plan the MDEP and the
City of Pittsfield approved the project. The City
probably approved the project based upon the information
verbally presented at the public hearing held for this
project and the site observations made during a site
inspection by the administrator."
BEAT Analysis
Despite the contention that the project
was "proceeding under a valid Order of Conditions", the MDEP
had not been informed of the fill, the NHESP had not been
informed of the encroachment of the project into endangered
species habitat, the site inspection did not include the
area in question, and a review of the audio tape of the
public hearing does not contain the missing information in
verbal format.
|