Dorothy Amos Park
and PCBs in the
West Branch of the Housatonic River
playground sign at Dorothy Amos Park
November 5, 2008 - GE has installed 5 large pipes that will be used to divert the river while they dig out the contaminated river sediment and bank soils. pipes floting in river

pipes stretch way upstream

The pipe stretch way up to the bend in the river at the north end of Dorothy Amos Park. 11/05/08

pipes coming under the bridge

The pipes run under the West Street bridge. 11/05/08

pipes end just below the bridge

The pipes run over a silt barrier. 11/05/08

The pipes extend a short distance downstream from the West Street bridge. 11/05/08

signs saying park closed

October 23, 2008, the Park is closed and equipment has been moved into th back of the Park.

river with silt fence running along the bank

A view from the West Street river bridge. Dorothy Amos Park is to the right, with silt fence and haybales between the Park and the West Branch of the Housatonic River. 10/23/08

silt fence and hay bales

A closer view of the silt fence along the bank. 10/23/08